The expansion of the Jiangsu section of Ningma Expressway started on November 1 and will become a two-way 8-lane drive.

Recently, the extension project of Liucun Interchange from Tongcun to Maanshan National Expressway to Tongjing Town Section (Suyujie) has issued a tender notice, which is scheduled to start on November 1 and has a construction period of 3 years.

It is reported that the project started from Liucun Interchange and was rebuilt and expanded along the existing old roads in the southwest. After the Lushan New City, Banqiao New City and Binjiang Development Zone, it ended in the Sujing provincial boundary of Tongjing Town. After the expansion and expansion, the Jiangsu section of the inter-provincial expressway connecting Nanjing and Anhui will be transformed into a two-way eight-lane road. Not only is the transportation between the two provinces more convenient, but residents of Banqiao New City, Jiangning Valley, and Tongjing along the line enter Nanjing. The road width of the main city will also be greatly widened, and the efficiency of the passage will be greatly improved.

Related News: Highway Construction Expansion

UV Wall Printer

Vertical UV Wall Printer can Direct to print any photo on any material, like wall, canvas, wood, Ceramic Tile, Glass, Wood, Metal etc., HAE Wall UV printer Printing resolution up to 1440dpi, can use CMYK+W color ink, can customize 2 printing heads machine

HAE UV wall Printer



UV Wall Printer,Wall UV Printer,Vertical UV Ink Wall Printer,Vertical UV Wall Printer

Wuhan HAE Technology Co., Ltd. , https://www.lnsuccess.com

Posted on