- Model NO.: HM-012
- Certification: ISO
- ABS: Without ABS
- Axle Number: 2
- Color: Customized
- Samping Time: 30 Days
- Trademark: None
- Specification: ASTM A128
- HS Code: 84139100
- Type: Pintle Hook
- Loading Weight: 50 Ton
- Tent Type: Simple
- Tire Number: 4
- Condition: New
- Lead Time: 45 Days
- Transport Package: Plywood Box
- Origin: Ningbo
Description: | Pintle hook |
Application: | Trailer |
Material: | High manganese steel |
Material Grade: | GB, ASTM , AISI , DIN , BS, JIS, NF |
Drawing Format accept: | Pdf,Jpg,CAD,IGS,STP,Pro-E |
Mould Tooling: | Made by CNC Machine |
Casting Process: Mainly machining process: |
Investment casting By Milling |
Surface Roughness | Ra1.6 |
Lead time for sample | 25-30 days |
Delivery for normal order | 40-45 days |
Heat Treatment | Water quenched |
Surface treatment | Sand blast |
Payment terms | T/T or negotiable |
Delivery port departure | Ningbo, Shanghai port |

Machining shop:

Test Equipment:
Â

Why Choose us:
*Zhongda had been engaged in Casting and Machining industry for more than 18 years.
Â
*The whole production cycle is monitored by our Quality Management System ISO 9001:2008 certified.
* We now supply all forms of casting parts and cnc machining parts:  lost wax investment casting, sand casting, and cnc machining services.Â
Â
* Rich OEM service experience.
Â
* Our products has been sold to more than 30 countries, we are very familiar with the whole markets, expecially for Europe, North America,Australia and Canada markets.
Â
* Our Commitment & Responsiblity:
   1.Competitive Price
   2.Strict Quality Control
   3.Quick Response To Any Inquires,Complaint,Technical Problem,etc
   4.Timely DeliveryÂ
     5.Small Quantity Acceptable
FAQ:
1. How long can I get the price?
Prices will be quoted within 24 hours after we get your inquiry with detailed information ( including drawings, material, surface treatment,quantity, special requirements,etc).
Â
2.How can I get a sample to check your quality?
On the case of quotation confirmed.Sample will be free of charge for customer approval, freight collect.
Â
3.How long can I expect to get the sample?
It depends on, normally 25 days~30 days (including mould making time). Samples will be shipped by DHL, FedEx, UPS, TNT or EMS,ect.
Â
4.What about the leading time for mass production?
It depends on the order quantity. Normally, 30~45 days after receiving of deposit.Â
Â
5.What is your MOQ?
We don't have a strict limit, small quantity is also workable.
Â
Our company can provide a complete set of processing Equipment and Technology for processing Waste Gas Treatment Equipment.We provide equipment and technical support for our partners with win-win cooperation. We hope to cooperate with you, you have technology, and your own production.The project becomes simple and convenient. You can send technicians to our company to learn technology and Processing Equipment operating.
Processing Equipment
Processing Equipment,Industrial Processing Equipment,Stainless Steel Processing Equipment
Shenzhen Xicheng Plastic Co., Ltd. , http://www.china-xicheng.com