On June 13th, Hubei Yingcheng Hongxiang Chemical Co., Ltd. held a ceremony for the start-up of the 200,000-ton/year aromatics separation plant, the entry of the China Petroleum Lanzhou-Zhengjiang-Long Oil Pipeline and the construction of a 80,000 cubic meter oil depot.
The company has formulated a three-step development strategy: The first step is to completely reform the 200,000-ton/year aromatics separation unit; the second step is to build a 80,000-cubic-meter oil product depot, which will then be irradiated south of Henan. All CNPC refueling outlets north of Wuhan; the third step is to build a 200,000-ton/year dimethyl ether production plant.
The company has formulated a three-step development strategy: The first step is to completely reform the 200,000-ton/year aromatics separation unit; the second step is to build a 80,000-cubic-meter oil product depot, which will then be irradiated south of Henan. All CNPC refueling outlets north of Wuhan; the third step is to build a 200,000-ton/year dimethyl ether production plant.
Plastic Parts,Abs Plastic Injection Molding,Abs Plastic Molding,Mold For Plastic
Ningbo Zongchi Machinery Technology Co., LTD , https://www.nbdiecastservice.com